The project is the construction of a Plastic Closure Production Hall, Warehouse and  Admin Building of 8.500 m2 covered area on a 20.000 m2 land, belonging to BERICAP EGYPT Co.; a subsidiary to international BERICAP HOLDING Group.

Beginning from the investment of the land, the main design according to the BERICAP standards, local design and construction, and budget control was conducted under our consultancy on behalf of BERICAP HOLDING Group. 

The project started in November 2009 and completed in December 2011.  The cost of the job is 2.500.000,-US Dollars.

BERICAP is one of the biggest plastic closure producers over the world with factories on 20 countries and representatives in 45 countries.