During the construction of the campus technical details of the TV studio were disregarded in the Cinema and Television Department’s building.
After technical details and ingredients of The Studio were finalized by authorities of the department, it was revealed that the building required restoration.
A huge shell of rectangular prism made of concrete and other layers of acoustic material was integrated into current building, being attached to external walls in a way that it can satisfy audio-acoustic infrastructure. During the re-construction and restoration of the building, all the application techniques were developed and applied by our company.
The project started in February‘2007 and was completed in April’2007.